A/A Contract Title / Brief Description Employer Architect/ Consultant Contract Amount Euro Duration Date of Commencem. Date of Completion
1 Construction of new petrol filling station for EKO (Hellenic Petroleum) in sovereign British Bases “Dhekelia” consisting of all civil & building works, widening of public road from 3 to 4 lanes. Hellenic Petroleum Ltd Michalis Michael and associates, Tel. 22444833 451.071 3 mo Sep. 2005 Jan. 2006
2 Demolition of existing petrol filling station (BP), removal off site of debris, removal of fuel tanks, excavation of contaminated soil disposal to designated area and refill of excavations with suitable material. Contaminated Soil testing, monitoring and reporting to MOD Defense Estates. Hellenic Petroleum Ltd MOD Defense Estates 15.377 2 wks Dec. 2005 Dec. 2005
3

Evrychou Service Station – Nicosia Demolition of all existing floors consisted of tarmac and concrete, removal and re-flooring with concrete surface including canopy foul water drainage renewal, fuel tank HSB street cover renewals and fuel separator tank installation at operational EKO Petrol Filling Station

Hellenic Petroleum Ltd

Hellenic Technical, Tel.: 24 533300

18.795

3 wks

Mar. 2006

Mar. 2006

4 Demolition of existing station (formely BP), Construction of new petrol filing station for EKO, with external works at Strovolos Avenue, Nicosia. Hellenic Petroleum Ltd Modinos & Vrahimis, Tel:  22 876050 362.224 3 mo Jul. 2006 Sep. 2008
5 Troodos Avenue Service Station – Nicosia Demolition of all existing concrete walls, extension of foul water drainage to facilitate service station entry widening, concrete flooring and tarmac construction at operational EKO Petrol Filling Station. Hellenic Petroleum Ltd Hellenic Technical, Tel.: 24 533300 18.795 3 wks Aug. 2006 Aug. 2006
6 Construction of new filling station for EKO (Cyprus) Ltd in Larnaca. Hellenic Petroleum Ltd Modinos & Vrahimis, Tel:  22 876050 415.190 3 mo Nov. 2006 Aug. 2008
7 Stasinou Avenue Service Station, Nicosia Demolition of all existing floors consisted of tarmac and concrete, removal and re-flooring with concrete surface including sewerage connection, fuel tank HSB street cover renewals and fuel separator tank installation at operational EKO Petrol Filling Station. Hellenic Petroleum Ltd Hellenic Technical, Tel.: 24 533300 34.170 3 wks Dec. 2006 Dec. 2006
8 Demolition of existing station and construction of new filling station for EKO (Cyprus) Ltd in Nicosia (Mimoza). Hellenic Petroleum Ltd Modinos & Vrahimis, Tel:  22 876050 199.906 3 mo Jul. 2007 Aug. 2007
9 Demolition of existing station (formely ESSO), Construction of new petrol filing station with external works at Galata (Troodos), Nicosia. Lukoil (Cyprus) Ltd Vacana Architects, Tel.: 25 727782 230.661 2 mo Jul. 2007 Sep. 2007
10 Demolition of existing station and construction of new filling station EKO (Cyprus) Ltd at Deftera, Nicosia. Hellenic Petroleum Ltd Modinos & Vrahimis, Tel:  22 876050 187.946 3 mo Sep. 2007 Feb. 2008
11 Demolition of existing station (formely ESSO), Construction of new petrol filing station for LUKOIL (CYPRUS) LTD with external works. Lukoil (Cyprus) Ltd Vacana Architects, Tel.: 25 727782 251.164 2 mo Nov. 2007 Apr. 2008
12 Corporate branding re-face - 3 stations in Nicosia Petrolina Ltd Petrolina Technical Department 100.000 3 mo Dec. 2007 Mar. 2008
13 Construction of new filling station for EKO (Cyprus) Ltd at Oroklini, Larnaka Hellenic Petroleum Ltd Modinos & Vrahimis, Tel:  22 876050 464.227 3 mo Jan. 2008 Mar. 2008
14 Construction of new filling station for EKO (Cyprus) Ltd at Dhali (Dixan), Nicosia. Hellenic Petroleum Ltd Modinos & Vrahimis, Tel:  22 876050 836.873 3 mo Jan. 2008 Mar. 2008
15 Construction of new filling station for EKO (Cyprus) Ltd at Ayia Varvara, Nicosia. Hellenic Petroleum Ltd Modinos & Vrahimis, Tel:  22 876050 441.844 3 mo Jan. 2008 Mar. 2008
16 Demolitions, removal and renewal of dispenser sumps (fuel pumps) at Akaki Village including fuel lines and electrical works for ESSO Petrol Filling Station. Lukoil (Cyprus) Ltd Michalis Michael and associates, Tel. 22444833 23.920 2 wks Mar. 2008 Mar. 2008
17 Demolition of existing station, Construction of new petrol filing station with external works at Kakopetria, Nicosia. Lukoil (Cyprus) Ltd Vacana Architects, Tel.: 25 727782 228.953 2 mo Mar. 2008 Jul. 2008
18 Mini-piling and external pavements at Trimiklini Service Station Petrolina Ltd Petrolina Technical Department 22.000 2 wks Apr. 2008 Apr. 2008
19 Construction of new petrol filing station for LUKOIL (CYPRUS) LTD with external works at Makedonia Avenue, Limassol Lukoil (Cyprus) Ltd Thrasou Bros Ltd 314.383 2 mo Apr. 2008 Jun. 2008
20 Bi-annual Asbestos removal contract within Nicosia district. Ministry of Communications & Works Public Works Department 170.860 24 mo    
21 Bulk Fuel Oil Tank sludge removal and cleaning at Vasiliko Power Station for Ansaldo Caldaie (Cyprus) Ltd. Ansaldo Caldaie (Cyprus) Ltd PB Power (UK) 35.881 2 wks    
22 Asbestos removal and roof panel replacement in Xylophagou, Ormidia & Xylotymbou Areas for PWD Ministry of Communications & Works

Ministry of Communications & Works

Tel.: 22 806786
76.631 3 mo    
23 Spartiatis Station at Paralimni – Famagusta  Demolition, removal and renewal of surface water drainage channels for EKO Petrol Filling Station. Hellenic Petroleum Ltd Hellenic Technical, Tel.: 24 533300   1 wk    
24 Artymatas Station at Paralimni – Famagusta  Demolition, removal and renewal of dispenser sums (fuel pumps) including fuel lines and electrical works for EKO Petrol Filling Station. Hellenic Petroleum Ltd Hellenic Technical, Tel.: 24 533300   1 wk    
25 DKS Petrol Station at Geroskipou– Paphos Demolition, removal and renewal of dispenser sums (fuel pumps) including fuel lines and electrical works for EKO Petrol Filling Station. Hellenic Petroleum Ltd Hellenic Technical, Tel.: 24 533300   1 wk    
26 Asbestos removal contract at Platania (Nicosia) and Yialia (Paphos) locations for the department of forestry. Department of Forestry Department of Forestry 11.106 3 mo    
27 Asbestos removal and roof panels fixing contract at Polemidia, Limassol.  Ministry of Defence Ministry of Defence 73.470 10 wks    
28 Chemical cleaning of boiler No. 3 (Stage I) superheater at Vasiliko Power Station Phase 1 Ansaldo Caldaie Cyprus SpA PB Power, Cyprus Electricity Authority 8.500 1wk (24 hrs shift)    
29 Chemical cleaning of boiler No. 3 (Stage II) superheater at Vasiliko Power Station Phase 2 Ansaldo Caldaie Cyprus SpA PB Power, Cyprus Electricity Authority 5.000 2 days (48 hrs shift)    
30 Construction of new petrol Station at Ayios Dhometios Lukoil (Cyprus) Ltd Y. Antoniou Architects & Andreas Vasiliou        
31 Construction of new petrol Station at Larnaca Lukoil (Cyprus) Ltd Y. Antoniou Architects & Andreas Vasiliou        
32 Construction of new EKO Petrol Station at Kolossi Hellenic Petroleum Ltd          
33 Construction of new EKO Petrol Station at Makedonias, Limassol Hellenic Petroleum Ltd          
34 Construction of new EKO Petrol Station at Peyia Hellenic Petroleum Ltd          
35 Construction of new EKO Petrol Station at Ayios Athanasios (Jumbo), Limassol Hellenic Petroleum Ltd